Building-scale vacuum systems for hotels and multi-unit properties.
Hospitality & Multi-Unit Buildings

Building-scale vacuum systems for hotels and multi-unit properties.

TVD designs central vacuum infrastructure, housekeeping access, riser routing, remote equipment rooms, and service plans for hospitality and multi-unit properties.

Central access Inlets, risers, and collection planned around building operations
Retrofit capable Routing options for operating buildings and phased renovations
Remote equipment Motor and collection placement planned away from occupied spaces where feasible
Service planned Filters, motors, hoses, and collection access built into the design

Housekeeping should not depend on hauling equipment through the property.

Hotels, senior living, apartments, condos, and mixed-use buildings need cleaning systems that respect occupant flow, storage limits, noise, and maintenance access.

Workflow

Reduce cart and equipment drag.

Well-placed inlets and hose storage can reduce the time staff spends moving equipment instead of cleaning.

Noise

Move equipment out of sensitive areas.

Remote motor and collection placement can reduce the amount of equipment operating in occupied corridors and rooms.

Maintenance

Make service predictable.

Collection, filters, and motors need to be reachable by maintenance staff without disrupting guests or residents.

Built around building layout and housekeeping routes.

TVD reviews floor plans, risers, closets, hallway inlets, equipment rooms, staff routes, renovation timing, and long-term service access.

Riser and pipe routing
01

Riser and pipe routing

Central vacuum piping can be planned through chases, closets, utility spaces, and renovation openings.

Remote equipment rooms
02

Remote equipment rooms

Collection and motors can be located away from guest or resident areas where building layout allows.

Housekeeping support
03

Housekeeping support

Portable support can supplement central access for specialty cleaning or maintenance tasks.

New-build and retrofit planning
04

New-build and retrofit planning

Layouts can be staged around occupied floors, renovations, or new construction schedules.

Design by property type and operating model.

Hospitality and multi-unit properties may need central vacuum infrastructure, portable support, phased retrofit, new-construction coordination, or custom service planning.

Central vacuum system
Central

Central vacuum system

Fixed inlets and remote collection for hotels, senior living, condos, and multi-unit buildings.

Risers and inlet layout
Infrastructure

Risers and inlet layout

Pipe routes, closets, chases, and storage planned around the building.

Portable backup
Portable

Portable backup

Support for maintenance, construction turnover, and areas outside central coverage.

Collection and filtration
Filtration

Collection and filtration

Filter and collection planning around service access and indoor air objectives.

Phased installation
Retrofit

Phased installation

Install planning around occupancy, renovation windows, new-build coordination, and maintenance access.

Design that works for both housekeeping and maintenance.
TVD Approach

Design that works for both housekeeping and maintenance.

TVD balances cleaning workflow, construction realities, storage, noise, and service access so the system stays usable after installation.

1

Map staff routes

Housekeeping paths, room turnover, amenity spaces, and service closets drive inlet placement.

2

Coordinate with building systems

Pipe routing must account for structural, fire, acoustic, electrical, and maintenance constraints.

3

Plan long-term service

Filters, collection, motors, and hoses should be accessible to the team responsible for daily operation.

Schedule Free Site Assessment

Designed around occupied-building constraints.

TVD coordinates system design with the property's construction, maintenance, and code partners. Final code compliance remains project-specific.

OSHA 1910.22 Housekeeping and walking-working surface support
Firestopping Penetration coordination with project code team
Acoustics Equipment location and occupied-space noise planning
Electrical Power and equipment-room planning
Maintenance Filter, motor, and collection access
Retrofit Phasing around occupied buildings and renovations
Common Questions

What property teams usually ask first.

These answers focus on retrofits, noise, staff workflow, and service.

Can central vacuum be added to an existing building?

Often, yes. Feasibility depends on chases, closets, ceiling access, equipment rooms, and renovation windows.

Where does the motor and collection equipment go?

Typically in a service area, equipment room, or remote location that maintenance can access without disturbing occupants.

Will the system be noisy?

Remote equipment placement and thoughtful routing can reduce noise in guest or resident areas compared with portable equipment.

Does every retrofit work?

No. Feasibility depends on chases, closets, ceiling access, firestopping requirements, equipment rooms, and renovation windows.

Free Site Assessment

Make property cleaning easier to operate.

Bring TVD in to review floor plans, staff routes, risers, equipment rooms, renovation windows, and maintenance access before the next buildout or retrofit.

Schedule Free Site Assessment
scroll to top